Utility scope planner

Write the infrastructure questions before the contract.

Select the systems your kitchen may use. The planner creates a coordinated question set for your appliance dealer, designer, licensed trades, contractor, and local authority.

01 Select systems
02 Site conditions

Sequence

Coordinate once, cut once.

01

Equipment schedule

Exact model, fuel, load, cutout, clearances, controls and service access.

02

Utility drawing

Routes, sizes, circuits, shutoffs, drains, sleeves and inspection points.

03

Enclosure detail

Vents, liners, noncombustible assembly, access doors and anchoring.

04

Counter template

Only after cabinets are installed, level, anchored and verified.

05

Commissioning

Test utilities, appliances, drainage, shutoffs, GFCI and documentation.