Included
Selected editable allowances plus the displayed contingency.
Complete-project builder
Select a starting configuration, then edit every allowance. The result is a transparent planning range you can take into design and contractor conversations.
What the total means
Selected editable allowances plus the displayed contingency.
Hidden conditions, local labor, tax, permit fees, access, and final engineering.
Replace equipment with exact SKUs and infrastructure with trade quotes.
Make every vendor fill the same line-item scope and exclusions.
Do not order built-ins until approved cutouts and utility locations are frozen.