Subgrade
Soil condition, organic removal, proofing, geotextile, stabilization, and unsuitable-soil allowance.
Patio & hardscape planning center
Patios are not just square footage. They carry structures, connect doors, manage water, protect equipment, organize traffic, and determine whether later projects feel integrated or improvised.
Planning ranges were checked October 19, 2026 and intentionally span multiple U.S. markets. They are not bids. Soil, demolition, access, excavation, drainage, freeze/thaw, permits, engineering, material, pattern, walls, steps, and local labor can move a project beyond them.
Build the plan
Enter dimensions, select a surface, add waste and project layers, then edit the ranges.
Open calculator →02 · LayoutCombine dining, cooking, lounge, fire, wellness, paths, and circulation into a practical area target.
Build activity plan →03 · CompareCompare concrete, pavers, porcelain, stone, gravel, decking, and turf by performance—not appearance alone.
Compare materials →04 · DiagnoseScore runoff, low spots, thresholds, downspouts, soil, slope, discharge, and freeze exposure.
Run drainage check →05 · LogisticsTranslate gate width, distance, stairs, elevators, protection, storage, and haul-out into quote questions.
Check access →06 · CompareRequire the same excavation, base, drainage, edge, material, compaction, cleanup, and warranty detail.
Open quote worksheet →07 · CoordinateSee hardscape alongside the kitchen, pergola, sauna, plunge, fire feature, room, and landscaping.
Open whole-yard planner →The hidden assembly
Long-term performance depends on what is excavated, what replaces it, how it is compacted, how edges are restrained, and where water goes. A low quote can be a different assembly—not the same project for less.
Soil condition, organic removal, proofing, geotextile, stabilization, and unsuitable-soil allowance.
Material, compacted depth, lifts, slope, equipment, and freeze/thaw design.
Surface pitch, infiltration, channels, downspouts, discharge, permits, and neighbor impact.
Thickness, finish, pattern, joints, bedding, slip resistance, heat, stain, and repair strategy.
Restraint, steps, walls, thresholds, transitions, planting interfaces, and settlement control.
Sequence before shopping
Confirm property, easements, setbacks, impervious limits, HOA rules, permits, utilities, trees, and discharge restrictions.
Place structures, appliances, equipment, furniture, doors, steps, paths, service panels, and future projects.
Complete drainage, sleeves, electrical, gas, water, footings, foundations, and retaining work before finish surfaces.
Excavate, stabilize, place base, set drainage, install edge and surface, then test slope and transitions.
Install lighting, planting, furniture, final equipment, seal only when appropriate, document care, and retain spare material.
The project rule
A useful proposal states square footage, demolition, excavation depth, base material and compacted depth, drainage, edge restraint, exact surface, cuts, pattern, steps, protection, restoration, cleanup, exclusions, payment schedule, and warranty.
Open the hardscape quote worksheet → · Build the first estimate →